A time study from Lorraine (France)
|
|
House erected in Oct. 2002 - one day for setting up the styro stones and concrete pour.
|
A demonstration for a small house (9*9 m) with trained people
|
|
Precut styro stones according to plan.
|
|
|
Range of styro stones to be used.
|
|
|
All the styro stones needed.
|
|
|
Fifth layer, windows openings visible.
|
|
|
After 1 hour, first floor is complete.
|
|
|
Gables from a different point of view.
|
|
|
Back Gables set, well within the second hour.
|
|